DRAM R/W Leadoff Timing

5/5 - (20 votes)
5/5 - (20 votes)

DRAM R/W Leadoff Timing

Option name:

DRAM R/W Leadoff Timing

Possible values of an option:

[5], [6], [7]

The option description:

Specifies number of clock periods by preparation for any operation of a read or write. As a rule there are enough [6] clock periods but if storage not so qualitative, can be demanded to increase this value to [7]. Besides, if claims to storage are not present, it is possible to look, as the system leads at value of [5] clock periods.

Leave a Reply

Your email address will not be published. Required fields are marked *

Share via
Copy link
Powered by Social Snap